• Mi UCrea
    Ver ítem 
    •   UCrea
    • UCrea Académico
    • Escuela Técnica Superior de Ingenieros Industriales y de Telecomunicación
    • Máster Universitario en Ingeniería Industrial
    • M2218 Trabajos académicos
    • Ver ítem
    •   UCrea
    • UCrea Académico
    • Escuela Técnica Superior de Ingenieros Industriales y de Telecomunicación
    • Máster Universitario en Ingeniería Industrial
    • M2218 Trabajos académicos
    • Ver ítem
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Instalaciones de fontanería, saneamiento, climatización y aerotermia de un colegio

    Plumbing, sanitation, air conditioning and aerothermal installations for a school

    Ver/Abrir
    459701.pdf (4.719Mb)
    Identificadores
    URI: https://hdl.handle.net/10902/38950
    Compartir
    RefworksMendeleyBibtexBase
    Estadísticas
    Ver Estadísticas
    Google Scholar
    Registro completo
    Mostrar el registro completo DC
    Autoría
    Gómez Revuelta, Alejandro
    Fecha
    2026-01-12
    Director/es
    Santisteban Díaz, AgustínAutoridad Unican
    Derechos
    © Alejandro Gómez Revuelta
    Resumen/Abstract
    Diseño de la instalación de climatización y fontanería de un nuevo edificio de ampliación de un colegio, el cual incluye zonas con aulas, una residencia, un comedor con cocina totalmente equipada, un pabellón, y un templo, así como una pequeña lavandería con lavadoras y secadoras, 2 aulas de informática, siendo el sistema de climatización basado en una bomba de calor, que junto con una caldera de gas se encargarán de la calefacción y producción de ACS del edificio. Así mismo, se realizará el cálculo y dimensionamiento de las protecciones correspondientes (válvulas de seguridad, limitadores de caudal, presostatos, etc.) siguiendo en todo momento el Reglamento de Instalaciones Térmicas en los Edificios (RITE), así como las normas, tanto generales como particulares, de las empresas suministradoras tanto de agua como de gas.
     
    Design of the heating and plumbing installation for a new extension building of a school. The project includes areas with classrooms, a residence, a dining hall with a fully equipped kitchen, a multipurpose hall, and a chapel, as well as a small laundry room with washers and dryers, and 2 computer labs. The heating system will be based on a heat pump, which, together with a gas boiler, will provide space heating and domestic hot water for the building. Furthermore, the calculation and sizing of the corresponding protective components (safety valves, flow limiters, pressure switches, etc.) will be carried out. All work will consistently follow the Regulations for Thermal Installations in Buildings (RITE), as well as the general and specific standards of the relevant water and gas utility companies.
    Colecciones a las que pertenece
    • M2218 Trabajos académicos [237]

    UNIVERSIDAD DE CANTABRIA

    Repositorio realizado por la Biblioteca Universitaria utilizando DSpace software
    Contacto | Sugerencias
    Metadatos sujetos a:licencia de Creative Commons Reconocimiento 4.0 España
     

     

    Listar

    Todo UCreaComunidades y coleccionesFecha de publicaciónAutoresTítulosTemasEsta colecciónFecha de publicaciónAutoresTítulosTemas

    Mi cuenta

    AccederRegistrar

    Estadísticas

    Ver Estadísticas
    Sobre UCrea
    Qué es UcreaGuía de autoarchivoArchivar tesisAcceso abiertoGuía de derechos de autorPolítica institucional
    Piensa en abierto
    Piensa en abierto
    Compartir

    UNIVERSIDAD DE CANTABRIA

    Repositorio realizado por la Biblioteca Universitaria utilizando DSpace software
    Contacto | Sugerencias
    Metadatos sujetos a:licencia de Creative Commons Reconocimiento 4.0 España