dc.contributor.author | Luis Ruiz, Julio Manuel de | |
dc.contributor.author | Pereda García, Raúl | |
dc.contributor.author | Pérez Álvarez, Rubén | |
dc.contributor.author | Piña García, Felipe | |
dc.contributor.author | Castillo López, Elena | |
dc.contributor.other | Universidad de Cantabria | es_ES |
dc.date.accessioned | 2024-03-21T13:57:38Z | |
dc.date.available | 2024-03-21T13:57:38Z | |
dc.date.issued | 2019-12-27 | |
dc.identifier.issn | 2372-3971 | |
dc.identifier.uri | https://hdl.handle.net/10902/32386 | |
dc.description.abstract | This research aims to establish the differences that are produced when calculating the volume of the excavation of a tunnel by means of equidistant cross sections obtained from a 3D model, and the 3D model itself, which was obtained from laser scanner data. The purpose of this research intends to contrast
numerically a methodology that has been traditionally applied (cross-sections), and a more recent one which is supported by the use of powerful calculation algorithms that are appropriate for 3D models.
All this research is applied to a tunnel that is used as spillway of a large dam that serves to regulate the water of a hydraulic facility. The results of this work justify in a quantitative way that, compared to the modern approach, the classical methodology produces deviations that can reach the 10% of the total volume of
the excavation, which implies very high expenses, given the costs of this kind of work. | es_ES |
dc.format.extent | 5 p. | es_ES |
dc.language.iso | eng | es_ES |
dc.publisher | Institute of Research Engineers and Doctors | es_ES |
dc.rights | © Los autores | es_ES |
dc.source | International Journal of Civil and Structural Engineering, 2019, 6(2), 7-11 | es_ES |
dc.subject.other | Drill and blast tunneling | es_ES |
dc.subject.other | Cubication | es_ES |
dc.subject.other | DTM | es_ES |
dc.subject.other | Crossed sections | es_ES |
dc.subject.other | Laser scanner | es_ES |
dc.title | Quantitative contrast between the methodologies for the volumetric evaluation with cross-sections and 3D models in tunnels excavated with explosives | es_ES |
dc.type | info:eu-repo/semantics/article | es_ES |
dc.rights.accessRights | openAccess | es_ES |
dc.type.version | publishedVersion | es_ES |