Quantitative contrast between the methodologies for the volumetric evaluation with cross-sections and 3D models in tunnels excavated with explosives
Ver/ Abrir
Registro completo
Mostrar el registro completo DCAutoría
Luis Ruiz, Julio Manuel de




Fecha
2019-12-27Derechos
© Los autores
Publicado en
International Journal of Civil and Structural Engineering, 2019, 6(2), 7-11
Editorial
Institute of Research Engineers and Doctors
Palabras clave
Drill and blast tunneling
Cubication
DTM
Crossed sections
Laser scanner
Resumen/Abstract
This research aims to establish the differences that are produced when calculating the volume of the excavation of a tunnel by means of equidistant cross sections obtained from a 3D model, and the 3D model itself, which was obtained from laser scanner data. The purpose of this research intends to contrast
numerically a methodology that has been traditionally applied (cross-sections), and a more recent one which is supported by the use of powerful calculation algorithms that are appropriate for 3D models.
All this research is applied to a tunnel that is used as spillway of a large dam that serves to regulate the water of a hydraulic facility. The results of this work justify in a quantitative way that, compared to the modern approach, the classical methodology produces deviations that can reach the 10% of the total volume of
the excavation, which implies very high expenses, given the costs of this kind of work.
Colecciones a las que pertenece
- D09 Artículos [449]
- D24 Artículos [88]