dc.description.abstract | La demolición de una estructura implica destruir y derribar la misma. Puede haber demoliciones parciales, que buscan derribar solo una parte específica, o demoliciones totales, que tienen como objetivo la caída completa de la estructura.
Para ello existen diferentes métodos de demolición, como pueden ser los medios manuales, los medios mecánicos (uso de maquinaria) o el uso de explosivos, pudiendo realizarse una combinación de ellos. El derrumbe de un edificio viene marcado por las características constructivas del mismo, es por ello que factores como el peso de la estructura, la altura o la esbeltez definen el método de demolición a seguir.
El presente trabajo consiste en el diseño de una voladura para demoler un conjunto de edificios de viviendas ubicado en la ciudad de Cádiz.
La superficie que se pretende despejar con el derribo de la estructura es de 2510,00 m2, coincidiendo esta cifra con la de ocupación del edificio, el cual presenta una forma trapezoidal con las esquinas en chaflán y a modo de manzana cerrada con sus cuatro fachadas a viario público. Para conseguir una demolición efectiva se debe actuar sobre los elementos portantes de la estructura, como son pilares de hormigón armado de dimensiones variables (30x30 cm, 50x50 cm), losas de hormigón armado de espesor de 24 a 30 cm, escaleras con un único giro de 180° entre plantas y muros de ascensores.
Sabiendo la distancia al edificio más cercano, 44,39m, se aplica el estudio de onda aérea, el cual estipula la máxima carga por microrretardo que se puede disparar, 4,4Kg. Por último, se realiza el diseño de la secuenciación en función de la dirección de caída que se desea conseguir. En el presente edificio se ha optado por realizar la voladura de la planta baja, la planta 1 y la planta 4, de tal manera que los escombros queden en la solera en la que se ubicaban los propios edificios, realizándose una secuenciación de abajo hacia arriba, con la peculiaridad de que se explotaran primero los pilares más céntricos de cada planta avanzando en la secuencia hacia los pilares más perimetrales. | es_ES |
dc.description.abstract | The demolition of a structure consists of the destruction and demolition of it, being able to distinguish between partial demolitions, which are only intended achieve the demolition of a specific part, or total demolitions, which have the object the total fall of the structure.
For this there are different demolition methods, such as the means manuals, mechanical means (use of machinery) or the use of explosives, a combination of them can be made. The collapse of a building comes marked by its construction characteristics, which is why factors such as the weight of the structure, the height or the slenderness define the method of demolition to follow.
The present work consists of the design of a blast to demolish a complex of residential buildings located in the city of Cádiz.
The area that is intended to be cleared with the demolition of the structure is 2510.00 m2, this figure coinciding with the occupancy of the building, which presents a trapezoidal shape with chamfered corners and like a closed apple with its four facades to public roads. To achieve an effective demolition, you must act on the load-bearing elements of the structure, such as concrete pillars reinforced concrete of variable dimensions (30x30 cm, 50x50 cm), reinforced concrete slabs 24 to 30 cm thick, stairs with a single 180º turn between floors and walls of elevators.
Knowing the distance to the nearest building, 44.39m, and the wave study is applied air, which stipulates the maximum micro delay charge that can be fired, 4.4Kg.
Finally, the sequencing design is carried out based on the direction drop that you want to achieve. In this building it has been decided to carry out the blasting of the ground floor, floor 1 and floor 4, in such a way that the debris remain in the floor in which the buildings themselves were located, making a bottom-up sequencing, with the peculiarity that first the most central pillars of each floor, advancing in sequence towards the more perimeter pillars. | es_ES |
dc.format.extent | 195 p. | es_ES |
dc.language.iso | spa | es_ES |
dc.rights | Attribution-NonCommercial-NoDerivatives 4.0 International | * |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | * |
dc.subject.other | Demolición | es_ES |
dc.subject.other | Voladura | es_ES |
dc.subject.other | Explosivos | es_ES |
dc.subject.other | Carga operante | es_ES |
dc.subject.other | Secuenciación | es_ES |
dc.subject.other | Demolition | es_ES |
dc.subject.other | Blasting | es_ES |
dc.subject.other | Explosives | es_ES |
dc.subject.other | Operating load | es_ES |
dc.subject.other | Sequencing | es_ES |
dc.title | Demolición conjunto edificatorio de 72 viviendas mediante voladura con explosivos | es_ES |
dc.title.alternative | Demolition of a building complex of seventy-two flats by blasting | es_ES |
dc.type | info:eu-repo/semantics/bachelorThesis | es_ES |
dc.rights.accessRights | openAccess | es_ES |
dc.description.degree | Grado en Ingeniería de los Recursos Energéticos | es_ES |