Mostrar el registro sencillo

dc.contributor.authorFernández-Ruiz, Jesús
dc.contributor.authorMiranda Manzanares, Marina 
dc.contributor.authorCastro Gonzalez, Jorge 
dc.contributor.authorMedina Rodríguez, Luis
dc.contributor.otherUniversidad de Cantabriaes_ES
dc.date.accessioned2021-12-20T13:49:03Z
dc.date.available2021-12-20T13:49:03Z
dc.date.issued2021-09
dc.identifier.issn2214-3912
dc.identifier.urihttp://hdl.handle.net/10902/23605
dc.description.abstractABSTRACT: The pressure to achieve a higher speed of train operation has increased in the last few years due to the development of high-speed railway lines. In the presence of soft soils, this speed increase is not possible without undertaking soil improvement measures, since the critical speed is lower than the desired speed of train operation. One of the most widely used soil improvement techniques is that of stone columns. In relation to these is the concept of critical length which, up to now, has only been studied for static cases. This research focuses, for the first time, on the enhancement of the critical speed in high-speed railways with stone columns and with special reference to critical length. Moreover, others parameters such as: maximum rail displacement and Dynamic Amplification Factor (DAF) are also studied. Analysing three profiles of ground representative of soft soils, it can be observed how the effect of the stone columns on critical speed is relevant, showing that critical length is different with respect to the three parameters above, the most restrictive one being that which corresponds to the critical speed. The influence of other parameters on the critical length and on the effectiveness of stone columns, such as the area replacement ratio, the dynamic pressure bulb and the existing soil stiffness is analysed and discussed.es_ES
dc.format.extent16 p.es_ES
dc.language.isoenges_ES
dc.publisherElsevieres_ES
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 Internationales_ES
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/*
dc.sourceTransportation Geotechnics 2021,30, 100628es_ES
dc.subject.otherStone columnses_ES
dc.subject.otherCritical lengthes_ES
dc.subject.otherCritical speedes_ES
dc.subject.otherHigh-speed railway lineses_ES
dc.subject.other3D dynamic numerical modeles_ES
dc.titleImprovement of the critical speed in high-speed ballasted railway tracks with stone columns: A numerical study on critical lengthes_ES
dc.typeinfo:eu-repo/semantics/articlees_ES
dc.relation.publisherVersionhttps://doi.org/10.1016/j.trgeo.2021.100628es_ES
dc.rights.accessRightsopenAccesses_ES
dc.identifier.DOI10.1016/j.trgeo.2021.100628
dc.type.versionpublishedVersiones_ES


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo

Attribution-NonCommercial-NoDerivatives 4.0 InternationalExcepto si se señala otra cosa, la licencia del ítem se describe como Attribution-NonCommercial-NoDerivatives 4.0 International