• Mi UCrea
    Ver ítem 
    •   UCrea
    • UCrea Académico
    • Escuela Técnica Superior de Náutica
    • Máster Universitario en Ingeniería Marina
    • M3779 Trabajos académicos
    • Ver ítem
    •   UCrea
    • UCrea Académico
    • Escuela Técnica Superior de Náutica
    • Máster Universitario en Ingeniería Marina
    • M3779 Trabajos académicos
    • Ver ítem
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Plan de mantenimiento buque cementero

    Maintenance Schedule for a cement vessel

    Ver/Abrir
    Batalla Martínez, Diego ... (2.188Mb)
    Batalla Martínez, Diego ... (46.70Kb)
    Identificadores
    URI: http://hdl.handle.net/10902/22192
    Compartir
    RefworksMendeleyBibtexBase
    Estadísticas
    Ver Estadísticas
    Google Scholar
    Registro completo
    Mostrar el registro completo DC
    Autoría
    Batalla Martínez, Diego
    Fecha
    2021-06-07
    Director/es
    Girón Portilla, Manuel AlfredoAutoridad Unican
    Derechos
    © Diego Batalla Martínez
    Palabras clave
    Mantenimiento
    AMOS (software de gestión del mantenimiento del barco)
    Cementero
    Buque
    AMOS (management software of boat’s maintenance)
    Cement carrier
    Ship
    Resumen/Abstract
    Con la resolución de este proyecto de fin de Máster, se ha tratado de explicar de manera detallada y con una descripción exhaustiva, todas las tareas de mantenimiento que hay que llevar a cabo en un tipo de buque concreto, como es un cementero. Se ha tomado como objeto del estudio, el buque cementero M/N encofrador, este barco de bandera española construido en 1983 sobresale por su notable antigüedad, la cual es gracias a una excelente labor de mantenimiento. Los principales objetivos de este trabajo son los siguientes: • Reconocer los equipos del departamento de máquinas y sus funciones • Atender y realizar el mantenimiento del buque • Manejar el software de mantenimiento con soltura, factor fundamental para llevar a cabo un mantenimiento correcto del barco. Al final del trabajo se proponen unas proposiciones de mejora, demostrando así la comprensión del mantenimiento del buque.
     
    ABSTRACT: Related to this Final Master Project, it has attempted to explain in a detailed and exhaustive description, all the maintenance tasks that it would be necessary to carry on with in a particular ship, as the cement carrier. To perform this study, the M/N cement carrier has been taken as a reference. This vessel, which flies the Spanish flag and it was built in 1983, is highlighted by its antiquity and remarkable value, thanks to all the maintenance tasks. The aim of the proyect are the follows: • Recognize machining departament teams and their duties • Attend and perform the maintenance of the vessel. To finish with, some suggestions for improvement are proposed, showing that the understanding of the ship management.
    Colecciones a las que pertenece
    • M3779 Trabajos académicos [96]

    UNIVERSIDAD DE CANTABRIA

    Repositorio realizado por la Biblioteca Universitaria utilizando DSpace software
    Contacto | Sugerencias
    Metadatos sujetos a:licencia de Creative Commons Reconocimiento 4.0 España
     

     

    Listar

    Todo UCreaComunidades y coleccionesFecha de publicaciónAutoresTítulosTemasEsta colecciónFecha de publicaciónAutoresTítulosTemas

    Mi cuenta

    AccederRegistrar

    Estadísticas

    Ver Estadísticas
    Sobre UCrea
    Qué es UcreaGuía de autoarchivoArchivar tesisAcceso abiertoGuía de derechos de autorPolítica institucional
    Piensa en abierto
    Piensa en abierto
    Compartir

    UNIVERSIDAD DE CANTABRIA

    Repositorio realizado por la Biblioteca Universitaria utilizando DSpace software
    Contacto | Sugerencias
    Metadatos sujetos a:licencia de Creative Commons Reconocimiento 4.0 España