Mostrar el registro sencillo
| dc.contributor.advisor | Hardy, Jean-Yves |  | 
| dc.contributor.advisor | Gómez Jáuregui, Valentín  |  | 
| dc.contributor.advisor | García, África |  | 
| dc.contributor.author | Riol Cepeda, María |  | 
| dc.contributor.other | Universidad de Cantabria | es_ES | 
| dc.date.accessioned | 2021-04-20T07:54:11Z |  | 
| dc.date.available | 2021-04-20T07:54:11Z |  | 
| dc.date.issued | 2020-12 |  | 
| dc.identifier.uri | http://hdl.handle.net/10902/21353 |  | 
| dc.format.extent | 208 p. | es_ES | 
| dc.language.iso | eng | es_ES | 
| dc.rights | ©María Riol Cepeda | es_ES | 
| dc.title | Design management and BIM coordination methodology at the Noisy-Champs Station (Grand Paris Express) : Application to the interface between structural steelwork and concrete infrastructure | es_ES | 
| dc.type | info:eu-repo/semantics/masterThesis | es_ES | 
| dc.rights.accessRights | restrictedAccess | es_ES | 
| dc.description.degree | Máster en Ingeniería de Caminos, Canales y Puertos (Plan 2020) | es_ES | 
 
             
        
Ficheros en el ítem
- Nombre:
 
- Riol Cepeda, Maria.pdf
 
- Tamaño:
 
- 5.333Mb
 
- Formato:
 
- PDF
 
 
 
 
Este ítem aparece en la(s) siguiente(s) colección(ones)
Mostrar el registro sencillo