• Mi UCrea
    Ver ítem 
    •   UCrea
    • UCrea Investigación
    • Departamento de Transportes y Tecnología de Proyectos y Procesos
    • D09 Congresos
    • Ver ítem
    •   UCrea
    • UCrea Investigación
    • Departamento de Transportes y Tecnología de Proyectos y Procesos
    • D09 Congresos
    • Ver ítem
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Innovations for smoke management in passenger trains

    Ver/Abrir
    InnovationsforSmokeM ... (1.493Mb)
    Identificadores
    URI: http://hdl.handle.net/10902/21260
    DOI: 10.1177/0734904119895775
    ISSN: 0734-9041
    ISSN: 1530-8049
    Compartir
    RefworksMendeleyBibtexBase
    Estadísticas
    Ver Estadísticas
    Google Scholar
    Registro completo
    Mostrar el registro completo DC
    Autoría
    Lázaro Urrutia, MarianoAutoridad Unican; Lázaro Urrutia, DavidAutoridad Unican; Cortabarría Caso, Edurne; Alvear Portilla, Manuel DanielAutoridad Unican
    Fecha
    2020-03
    Derechos
    © The Author(s). Article reuse guidelines: sagepub.com/journals-permissions
    Publicado en
    Journal of Fire Sciences, 2020, 38(2), 194-211
    5th Iberian-Latin-American Congress on Fire Safety (CILASCI), Porto, Portugal, 2019
    Editorial
    SAGE
    Enlace a la publicación
    https://doi.org/10.1177/0734904119895775
    Palabras clave
    Fire modelling
    Smoke management
    Train
    Fire safety
    Real scale fire tests
    Resumen/Abstract
    Spanish manufacturer Construcciones y Auxiliar de Ferrocarriles developed an innovative alternative for compartmentation, based on a smoke extraction system, to guarantee safe conditions during evacuation processes in a passenger unit. To demonstrate its performance in a train unit, a real-scale experimental programme, supported by the application of fire computer modelling, was applied in a new Construcciones y Auxiliar de Ferrocarriles' rolling stock. The new smoke exhaust system aims to extract the smoke generated during a fire in the passenger area by exhaust fans of the heating, ventilation, and air conditioning system, allowing the ingress of fresh exterior air in the lower part of the rear ends of the car. These key elements create an air flow that evacuates the smoke to prevent people from being exposed to it. Full-scale fire tests were developed in the train unit following the Australian standard AS 4391-1999. A fire of 140kW was used, and the smoke was generated by a clean smoke machine. Measurement points included six thermocouple trees, 10 gas flow velocity probes and two GoPro HD video cameras (for the estimation of the visibility). The system performance was successful with the tenability criteria, since the value of visibility at the non-fire car was greater than 30 m and the temperature was lower than 30°C during all the tests at a height of 1.7m above the floor. Experimental results were used to validate the computational model. The computational model results show a good accuracy compared with the tests.
    Colecciones a las que pertenece
    • D09 Congresos [59]

    UNIVERSIDAD DE CANTABRIA

    Repositorio realizado por la Biblioteca Universitaria utilizando DSpace software
    Contacto | Sugerencias
    Metadatos sujetos a:licencia de Creative Commons Reconocimiento 4.0 España
     

     

    Listar

    Todo UCreaComunidades y coleccionesFecha de publicaciónAutoresTítulosTemasEsta colecciónFecha de publicaciónAutoresTítulosTemas

    Mi cuenta

    AccederRegistrar

    Estadísticas

    Ver Estadísticas
    Sobre UCrea
    Qué es UcreaGuía de autoarchivoArchivar tesisAcceso abiertoGuía de derechos de autorPolítica institucional
    Piensa en abierto
    Piensa en abierto
    Compartir

    UNIVERSIDAD DE CANTABRIA

    Repositorio realizado por la Biblioteca Universitaria utilizando DSpace software
    Contacto | Sugerencias
    Metadatos sujetos a:licencia de Creative Commons Reconocimiento 4.0 España