    Cálculo y diseño del servicio de sentinas en un buque de SASEMAR

    Bilge circuit analysis and design of a SASEMAR vessel

    Ver/Abrir
    20t_gmaTFG_72183104L ... (2.061Mb)
    20t_gmaTFGres_Diseño ... (8.200Kb)
    Identificadores
    URI: http://hdl.handle.net/10902/20382
    Compartir
    RefworksMendeleyBibtexBase
    Estadísticas
    Ver Estadísticas
    Google Scholar
    Registro completo
    Mostrar el registro completo DC
    Autoría
    Lavín Suárez, Pablo
    Fecha
    2020-08
    Director/es
    Río Calonge, BelénAutoridad Unican
    Derechos
    © Pablo Lavín Suárez
    Palabras clave
    Sentina
    Separador
    Pocete
    Lodos
    Decantación.
    Bilge
    Separator
    Mud boxes
    Decantation
    Resumen/Abstract
    Resumen. El proyecto se basa en el diseño del sistema de sentina del buque Don Inda, para poder analizar y presupuestar dicho sistema. He escogido este sistema debido a que la sentina necesitaba un saneamiento por su estado actual, pudiendo así plantear un posible cambio y mejora aprovechando dicha obra. Realizaremos dicho proyecto como si se tratara de la instalación de un sistema de sentinas de nueva construcción con la actualización del reglamento vigente tanto de la sociedad de clasificación como de la norma aplicada a dicho sistema, seleccionando algún elemento que podamos aprovechar del sistema anterior y que no comprometa la instalación
     
    Abstract. The project is based on the design of the bilge system of the Don Inda vessel, in order to analyze and budget this system. I have chosen this system because the bilge needed a sanitation due to its current state, thus being able to propose a possible change and improvement taking advantage of this work. We will carry out said project as if it were the installation of a new bilge system with the update of the current regulation of both the classification society and the standard applied to said system, selecting some element that we can take advantage of the previous system and that Do not compromise the installation
    Colecciones a las que pertenece
    • G1769 Trabajos académicos [93]

    UNIVERSIDAD DE CANTABRIA

    Repositorio realizado por la Biblioteca Universitaria utilizando DSpace software
    Contacto | Sugerencias
    Metadatos sujetos a:licencia de Creative Commons Reconocimiento 4.0 España
     

     

    Listar

    Todo UCreaComunidades y coleccionesFecha de publicaciónAutoresTítulosTemasEsta colecciónFecha de publicaciónAutoresTítulosTemas

    Mi cuenta

    AccederRegistrar

    Estadísticas

    Ver Estadísticas
    Sobre UCrea
    Qué es UcreaGuía de autoarchivoArchivar tesisAcceso abiertoGuía de derechos de autorPolítica institucional
    Piensa en abierto
    Piensa en abierto
    Compartir

    UNIVERSIDAD DE CANTABRIA

    Repositorio realizado por la Biblioteca Universitaria utilizando DSpace software
    Contacto | Sugerencias
    Metadatos sujetos a:licencia de Creative Commons Reconocimiento 4.0 España