dc.description.abstract | RESUMEN: Debido a las normativas europeas y a su general utilidad en proyectos de construcción, la metodología BIM (Building Information Modeling) está en el centro de las nuevas tecnologías aplicadas a la ingeniería civil. Esta metodología es más útil cuando se utiliza desde la fase de proyecto, pero es posible aplicar sus ventajas en fase de explotación a instalaciones ya construidas. Para ello es necesario crear un modelo BIM de la instalación.
En este documento se desarrolla dicho proceso en el caso de la EDAR de León y su Alfoz, centrando el trabajo en la parte MEP de la instalación. Tras un breve estado del arte, se explica el proceso de toma de datos con dron y escáneres láser, modelado de la instalación mediante Autodesk Revit y la utilización de dicho modelo tanto para mejorar los sistemas de gestión GMAO y SCADA de la instalación como para el desarrollo de herramientas de realidad aumentada.
También se presentan documentos de planos, creados mediante el modelo en detalle construido en Revit, con los diámetros de las tuberías y con los equipos identificados.
Por último, se incluye un presupuesto con el coste del proyecto. | es_ES |
dc.description.abstract | Due to European standards and its general usefulness in construction projects, BIM (Building Information Modeling) technology is growing in the field of Civil Engineering. This methodology is more useful when used from the design phase of the project. However, it is possible to benefit from the advantages it brings in already built facilities if a BIM model of them is created.
This document details the process of modelling the MEP elements fo the WWTP (Waste Water Treatment Plant) of León. After a brief state of the art, the process of obtaining data by drones and terrestrial laser scanners is detailed. Then, there is an overview of modelling the facility in Autodesk Revit using the cloud point previously obtained as a starting point. This model is later linked to the CMMS and SCADA management systems of the WTTP. Finally, augmented reality software and hardware are used to improve the readibility of the data.
Detailed plans of the final model, created with Autodesk Revit, are included in the project. The plans are delimited and the equipment is properly identified.
Finally, there is a budget with the final cost of the project. | es_ES |
dc.format.extent | 57 p. | es_ES |
dc.language.iso | spa | es_ES |
dc.rights | Atribución-NoComercial-SinDerivadas 3.0 España | * |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/3.0/es/ | * |
dc.title | Modelado BIM 7D de la red MEP de la EDAR de León y su Alfoz para operación y mantenimiento | es_ES |
dc.type | info:eu-repo/semantics/masterThesis | es_ES |
dc.rights.accessRights | embargoedAccess | es_ES |
dc.description.degree | Máster en Ingeniería de Caminos, Canales y Puertos | es_ES |
dc.embargo.lift | 2025-09-30 | |
dc.date.embargoEndDate | 2025-09-30 | |