dc.contributor.author | Palacios, Juan José | |
dc.contributor.author | González Rodríguez, Inés | |
dc.contributor.author | Vela, Camino | |
dc.contributor.author | Puente, Jorge | |
dc.contributor.other | Universidad de Cantabria | es_ES |
dc.date.accessioned | 2020-03-04T19:22:52Z | |
dc.date.available | 2020-03-04T19:22:52Z | |
dc.date.issued | 2019 | |
dc.identifier.issn | 1069-2509 | |
dc.identifier.issn | 1875-8835 | |
dc.identifier.other | TIN2016-79190-R | es_ES |
dc.identifier.uri | http://hdl.handle.net/10902/18338 | |
dc.description.abstract | This paper tackles the job shop scheduling problem with fuzzy sets modelling uncertain durations and flexible due dates. The objective is to achieve high-service level by maximising due-date satisfaction, considering two different overall satisfaction measures as objective functions. We show how these functions model different attitudes in the framework of fuzzy multicriteria decision making and we define a measure of solution robustness based on an existing a-posteriori semantics of fuzzy schedules to further assess the quality of the obtained solutions. As solving method, we improve a memetic algorithm from the literature by incorporating a new heuristic mechanism to guide the search through plateaus of the fitness landscape. We assess the performance of the resulting algorithm with an extensive experimental study, including a parametric analysis, and a study of the algorithm’s components and synergy between them. We provide results on a set of existing and new benchmark instances for fuzzy job shop with flexible due dates that show the competitiveness of our method. | es_ES |
dc.description.sponsorship | This research has been supported by the Spanish Government under research grant TIN2016-79190-R. | es_ES |
dc.format.extent | 19 p. | es_ES |
dc.language.iso | eng | es_ES |
dc.publisher | IOS Press | es_ES |
dc.rights | © IOS Press. | es_ES |
dc.source | Integrated Computer-Aided Engineering, vol. 26, no. 1, pp. 65-84, 2019 | es_ES |
dc.subject.other | Job Shop Scheduling | es_ES |
dc.subject.other | Fuzzy processing times | es_ES |
dc.subject.other | Flexible due dates | es_ES |
dc.subject.other | Memetic Algorithm | es_ES |
dc.subject.other | Robustness | es_ES |
dc.title | Satisfying flexible due dates in fuzzy job shop by means of hybrid evolutionary algorithms | es_ES |
dc.type | info:eu-repo/semantics/article | es_ES |
dc.rights.accessRights | openAccess | es_ES |
dc.identifier.DOI | 10.3233/ICA-180583 | |
dc.type.version | acceptedVersion | es_ES |