dc.contributor.advisor | Argos Barriocanal, Bernardo | |
dc.contributor.author | Torán Zorrilla, Fermín | |
dc.contributor.other | Universidad de Cantabria | es_ES |
dc.date.accessioned | 2019-06-11T07:30:48Z | |
dc.date.available | 2019-06-11T07:30:48Z | |
dc.date.issued | 2019-05-20 | |
dc.identifier.uri | http://hdl.handle.net/10902/16327 | |
dc.description.abstract | RESUMEN: Mientras se redacta este proyecto hay en marcha un Proyecto Singular de Interés Regional (PSIR) consistente en la urbanización de un gran centro logístico-industrial que se ubicará en el Llano de la Pasiega, en el término municipal de Piélagos (Cantabria). El presente documento trata de proponer una solución técnica para la electrificación de dicho centro logístico-industrial, concretamente de la red de distribución de energía eléctrica. Queda por tanto fuera del alcance de este proyecto las redes de transporte de energía eléctrica (subestaciones y aguas arriba) y las instalaciones de enlace e interiores (caja general de protección y aguas abajo). El diseño del trazado de la red de distribución ha ido precedido necesariamente de un diseño del urbanismo industrial del centro logístico, ya que a fecha de 2018 el Llano de la Pasiega es un solar, y también de una previsión de cargas. Este Proyecto Fin de Máster tiene tan sólo fines académicos y está compuesto por los distintos documentos básicos (Memoria, Anexos, Planos, etc.) que en su conjunto dan forma a la solución adoptada de una manera más desarrollada que un proyecto de Ingeniería Básica, pero sin llegar a alcanzar el nivel de concreción de la Ingeniería de Detalle. | es_ES |
dc.description.abstract | ABSTRACT: While this project is being drafted, a Singular Project of Regional Interest is underway. This project consists on the development of a large logistic-industrial center located in the northern-Spain region of Cantabria. This document makes a technical solution proposal for the electrification of the referred industrial park and its power distribution network. Power transport networks (substations and upstream) are outside of the scope of this project, as well as connection and interior facilities (general protection box and downstream). The Distribution Network layout design has been necessarily preceded by a brief design of Industrial Park Urbanism (As at date of 2018 the Llano de la Pasiega is still countryside), and also preceded by a forecast of loads. This Master’s Degree Project has only academic purposes and it is composed by the main documents (Memory, Annexes, Drawings, etc.) that all together give an accurate solution – a more complete one than a Basic Engineering project, although it is does not reach the level of concretion of the Detailed Engineering –. | es_ES |
dc.format.extent | 212 p. | es_ES |
dc.language.iso | spa | es_ES |
dc.rights | Atribución-NoComercial-SinDerivadas 3.0 España | * |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/3.0/es/ | * |
dc.subject.other | Instalaciones eléctricas | es_ES |
dc.subject.other | Urbanismo industrial | es_ES |
dc.subject.other | Electrificación | es_ES |
dc.subject.other | Polígono industrial | es_ES |
dc.subject.other | Distribución energía eléctrica | es_ES |
dc.subject.other | Baja tensión | es_ES |
dc.subject.other | Alta tensión | es_ES |
dc.subject.other | Transformadores | es_ES |
dc.title | Electrificación del polígono industrial de El Llano de la Pasiega | es_ES |
dc.title.alternative | Industrial park of El Llano de la Pasiega electrification project | es_ES |
dc.type | info:eu-repo/semantics/masterThesis | es_ES |
dc.rights.accessRights | openAccess | es_ES |
dc.description.degree | Máster en Ingeniería Industrial | es_ES |