@conference{10902/7671, year = {2015}, month = {4}, url = {http://hdl.handle.net/10902/7671}, abstract = {The grid integration of renewable energy, and particularly in Spain, supposes an important problem to deal with for Distributor System Operators (DSO). Most of the times Wind Energy Farms are located in places that are far away from the transmission networks so they have to be integrated into distribution networks that are frequently next to their static rate. Current regulations make almost impossible to build new overhead lines so the increase of the capacity of the existing lines is a new target for the DSO. One of the developed options to solve this issue is the dynamic management of the network. This paper is devoted to the analysis of a real case of ampacity management in a 132 kV overhead line placed in a high-wind generation area. The obtained results show that this approach can increase the lines capacity in a significant percentage.}, organization = {This work was supported by the Spanish Government under the R+D initiative INNPACTO with reference IPT-2011-1447-920000 and Spanish R+D initiative with reference ENE2013-42720-R. The authors want also to acknowledge E.on Distribution for its support and help.}, publisher = {European Association for the Development of Renewable Energies, Environment and Power Quality (EA4EPQ)}, publisher = {Renewable Energy & Power Quality Journal, 2015, 1(13), 797-800}, publisher = {International Conference on Renewable Energies and Power Quality (ICREPQ’15), La Coruña}, title = {Analysis of a real case of ampacity management in a 132 kV network integrating high rates of wind energy}, author = {Madrazo Maza, Alfredo and González, A. and Martínez Torre, Raquel and Domingo Fernández, Rodrigo and Mañana Canteli, Mario and Arroyo Gutiérrez, Alberto and Castro Alonso, Pablo Bernardo and Silió Salcines, Delfín and Lecuna Tolosa, Ramón}, }